Banksia Community Care Banner Ad - draft
spreads (12).gif

Roadwork on Kings Highway next week


Commuters using the Kings Highway can expect minor delays as a section of damaged pavement is patched and resurfaced this month.

Approximately 900 metres of highway, starting 100 metres from the Bayridge Road intersection and running west, has deteriorated due to heat and high levels of traffic over the busy Christmas holiday period.

The work to patch badly affected areas and resurface the entire segment with new high-grip asphalt is scheduled to occur between 7am and 6pm, Tuesday 12 to Friday 15 March, weather permitting.

There are three lanes at this location, with at least one or two lane closures each day. Traffic control will be in place, with minor delays expected.

Eurobodalla Council has a contract to manage the work on behalf of Roads and Maritime Services. For more information contact Council’s Moruya Depot on 4474 1391.


#Council #BatemansBay #Weekly #LocalStateFederal

Phillips---Banner.png

COMMENTS : Due to the risks associated with comments from unidentified contributors that expose The Beagle to possible legal actions under the NSW Defamation Act 2005 No 77 anonymous or Nom de Plume comments will not be available until an alternate system of author verification can be investigated and hopefully installed.

Those who provide their REAL NAME (first name AND Surname) and a verifiable email address (it won't be published) are invited to comment below. (yes it is a pain but please comply - it would be a  shame to see your comment deleted)

Those contributors KNOWN to us and verified may continue to use their First Name for ease. The primary need for all of this is due to traceability should a legal action arise.

If you need anonymity email us via our normal or encrypted email accounts


Please note that if you are looking for a previous comment that is no longer visible please contact us.