sctg-banner-wide2.png
spreads.gif

Changed Traffic Conditions For Work Near Batemans Bay Bridge


CHANGED TRAFFIC CONDITIONS FOR WORK NEAR BATEMANS BAY BRIDGE

Motorists are advised changed traffic conditions will be in place from today to carry out investigation work for the replacement Batemans Bay Bridge.

Roads and Maritime Services will be carrying out the work between North Street on the southern side of the bridge and on the Kings and Princes Highways on the northern side.

Work will take place from Friday 9 February between 7am and 6pm on weekdays and between 8am and 1pm on Saturdays for about three weeks, weather permitting.

For the safety of workers and motorists, lane closures and a reduced speed limit of 40 km/h will be in place during work hours.

Motorists are advised to follow the directions of traffic control and signs and keep to the reduced speed limit.

Roads and Maritime thank the community for their patience while work is carried out.

For the latest traffic updates call 132 701, visit livetraffic.com or download the Live Traffic NSW App


#Community #State #LocalStateFederal #BatemansBay

COMMENTS : You can use a pen name or better yet use your real name, you must provide a valid email address (that does not get published) and your comment will be moderated prior to approval (or rejection if that is the determination of the moderator). Refer to our Terms and Conditions if you have any questions) 

Please note that from time to time comments are archived. If you are looking for a previous comment no longer visible please contact us. Last Archived 7th July 2019