fiona.png
spreads (15).gif

Batemans Bay Bridge update


Out and about yesterday doing property shoots Rob and Kate of South Coast Pix called by to capture an update of the work happening around the Batemans Bay bridge. with Rob saying "Looks like it won't be long before the first pylon will be installed."

From the photos you can see work has begun on the northern abutment and that piles are already in place on the southern side.

A larger crane and barge are expected to arrive on site to carry out the mid stream pile placements.

Photos courtesy of South Coast Pix








#latest #BatemansBay #Paper

COMMENTS : Due to the risks associated with comments from unidentified contributors that expose The Beagle to possible legal actions under the NSW Defamation Act 2005 No 77 anonymous or Nom de Plume comments will not be available unless the author is known to the editor by way of a verified email address or by association.

Others who provide their REAL NAME (first name AND Surname) and a verifiable email address (it won't be published) are invited to comment below. (yes it is a pain but please comply - it would be a  shame to see your comment deleted)

Those contributors KNOWN to us and verified may continue to use their First Name or Nom de plume for ease. The primary need for all of this is due to traceability should a legal action arise.

If you need anonymity email us via our normal or encrypted email accounts


Please note that if you are looking for a previous comment that is no longer visible please contact us.