fiona.png
spreads (7).gif

Batemans Bay Bridge testing Monday night June 17th from 8pm to 6am


Motorists are advised of changed traffic conditions next week on the Princes Highway at Batemans Bay Bridge for routine inspection work and weight limit testing.

There will be temporary lane closures in place for workers to inspect the bridge.

Work will be carried out between 8pm and 6am on Monday 17 June, weather permitting, to minimise impact to motorists

Motorists are advised to allow an additional five minutes travel time, to drive to the conditions, and follow the directions of signs and traffic control.

Roads and Maritime Services thanks the community for its patience while work is carried out.

For the latest traffic updates call 132 701, visit livetraffic.com or download the Live Traffic NSW App.

#latest #Paper #BatemansBay

COMMENTS : Due to the risks associated with comments from unidentified contributors that expose The Beagle to possible legal actions under the NSW Defamation Act 2005 No 77 anonymous or Nom de Plume comments will not be available until an alternate system of author verification can be investigated and hopefully installed.

Those who provide their REAL NAME (first name AND Surname) and a verifiable email address (it won't be published) are invited to comment below. (yes it is a pain but please comply - it would be a  shame to see your comment deleted)

Those contributors KNOWN to us and verified may continue to use their First Name for ease. The primary need for all of this is due to traceability should a legal action arise.

If you need anonymity email us via our normal or encrypted email accounts


Please note that if you are looking for a previous comment that is no longer visible please contact us.