sctg-banner-wide2.png
spreads.gif

Changed Traffic Conditions For Servicing Of Batemans Bay Bridge Lift Span


Motorists are advised of changed traffic conditions on the Princes Highway at Batemans Bay Bridge between Sunday 19 and Tuesday 21 August for maintenance and servicing to be carried out on the bridge.

Maintenance will be carried out to ensure the reliable operation of the bridge opening. This is to minimise incidents with the lift system and reduce delays for motorists and marine traffic.

Work will be carried out at night to reduce the impact on motorists, across three nights between 8pm and 4am from Sunday 19 August, weather permitting.

Motorists are advised to plan their journey, with delays of up to 15 minutes expected as testing takes place.

Motorists should plan their trip, allow extra travel time, drive to the conditions, and follow the directions of signs and traffic control.

Roads and Maritime Services thanks the community for its patience while work is carried out.

For the latest traffic updates call 132 701, visit livetraffic.com or download the Live Traffic NSW App


#latest #Paper #BatemansBay

COMMENTS : You can use a pen name or better yet use your real name, you must provide a valid email address (that does not get published) and your comment will be moderated prior to approval (or rejection if that is the determination of the moderator). Refer to our Terms and Conditions if you have any questions) 

Please note that from time to time comments are archived. If you are looking for a previous comment no longer visible please contact us. Last Archived 7th July 2019