top of page

Resurfacing work Beach Road, Batehaven Apr 30th

  • Writer: The Beagle
    The Beagle
  • Apr 26, 2018
  • 1 min read

Motorists are advised of possible minor traffic delays along Beach Road at Batehaven on Monday April 30th morning.

Eurobodalla Council’s contractor will be resurfacing a section of Beach Road in front of the Batehaven shops, starting just after 9am.

The road will remain open during this work, however speed reduction and traffic control will be in place. Council says the work should be finished by 1pm.

The resurfacing work waterproofs the underlying road pavement and increases longevity of the road.

Motorists are asked to slow down and follow traffic control directions around the work site.

 
 

NOTE: Comments were TRIALED - in the end it failed as humans will be humans and it turned into a pile of merde; only contributed to by just a handful who did little to add to the conversation of the issue at hand. Anyone who would like to contribute an opinion are encouraged to send in a Letter to the Editor where it might be considered for publication

bottom of page