fiona.png
spreads (7).gif

Resurfacing work Beach Road, Batehaven Apr 30th


Motorists are advised of possible minor traffic delays along Beach Road at Batehaven on Monday April 30th morning.

Eurobodalla Council’s contractor will be resurfacing a section of Beach Road in front of the Batehaven shops, starting just after 9am.

The road will remain open during this work, however speed reduction and traffic control will be in place. Council says the work should be finished by 1pm.

The resurfacing work waterproofs the underlying road pavement and increases longevity of the road.

Motorists are asked to slow down and follow traffic control directions around the work site.

#BatemansBay #latest #Community #Paper

COMMENTS : Due to the risks associated with comments from unidentified contributors that expose The Beagle to possible legal actions under the NSW Defamation Act 2005 No 77 anonymous or Nom de Plume comments will not be available until an alternate system of author verification can be investigated and hopefully installed.

Those who provide their REAL NAME (first name AND Surname) and a verifiable email address (it won't be published) are invited to comment below. (yes it is a pain but please comply - it would be a  shame to see your comment deleted)

Those contributors KNOWN to us and verified may continue to use their First Name for ease. The primary need for all of this is due to traceability should a legal action arise.

If you need anonymity email us via our normal or encrypted email accounts


Please note that if you are looking for a previous comment that is no longer visible please contact us.