fiona.png
spreads (14).gif

Dalmeny roadworks begin


Dalmeny roadworks begin

Eurobodalla Council crews will begin roadworks in Dalmeny on Tuesday in preparation for Council’s annual reseal program.

The pavement repair work will begin Tuesday 1 August at the Dalmeny Drive/Lakeside Drive intersection.

Work will progress south along Dalmeny Drive to the Princes Highway intersection and is expected to be complete by Monday 14 August, weather permitting.

Motorists are asked obey signage and take care when driving in the vicinity of the works.

The repairs will lay the groundwork for Council’s $1.7 million annual reseal program, which will reseal more than 80 local roads and car parks with bitumen throughout Eurobodalla in 2017-18. Resealing roads is vital to help protect the structural road pavements from moisture and provide good grip for improved road safety.

Dalmeny works scheduled in the coming year include the full length of the Beach Access Road and the Mummaga Lake footbridge car park Media Release

#Council #LocalStateFederal #Dalmeny

COMMENTS : Due to the risks associated with comments from unidentified contributors that expose The Beagle to possible legal actions under the NSW Defamation Act 2005 No 77 anonymous or Nom de Plume comments will not be available until an alternate system of author verification can be investigated and hopefully installed.

Those who provide their REAL NAME (first name AND Surname) and a verifiable email address (it won't be published) are invited to comment below. (yes it is a pain but please comply - it would be a  shame to see your comment deleted)

Those contributors KNOWN to us and verified may continue to use their First Name for ease. The primary need for all of this is due to traceability should a legal action arise.

If you need anonymity email us via our normal or encrypted email accounts


Please note that if you are looking for a previous comment that is no longer visible please contact us.