fiona.png
spreads (14).gif

Night work on Princes Highway at Batemans Bay - Mar 1 to 3


NIGHT WORK ON PRINCES HIGHWAY AT BATEMANS BAY Motorists are advised of changed traffic conditions on the Princes Highway at Batemans Bay from next week for essential maintenance work. To provide a safer road for motorists, resealing work will be carried out between Wharf and Clyde Roads. To minimise the impact on motorists, work is scheduled for three nights between 7pm and 3.30am from Wednesday 1 March to Friday 3 March, weather permitting. For the safety of workers and motorists, traffic control, temporary lane closures and alternating traffic flow will be in place during work hours, with delays of up to five minutes expected. A temporary speed limit of 40 km/h will also be in place. Motorists should plan their journey and allow for additional travel time. Roads and Maritime thanks the community for its patience while work is carried out. For the latest traffic information visit www.livetraffic.com, download the Live Traffic App or call the Transport Management Centre on 132 701.


#BatemansBay #latest

COMMENTS : Due to the risks associated with comments from unidentified contributors that expose The Beagle to possible legal actions under the NSW Defamation Act 2005 No 77 anonymous or Nom de Plume comments will not be available until an alternate system of author verification can be investigated and hopefully installed.

Those who provide their REAL NAME (first name AND Surname) and a verifiable email address (it won't be published) are invited to comment below. (yes it is a pain but please comply - it would be a  shame to see your comment deleted)

Those contributors KNOWN to us and verified may continue to use their First Name for ease. The primary need for all of this is due to traceability should a legal action arise.

If you need anonymity email us via our normal or encrypted email accounts


Please note that if you are looking for a previous comment that is no longer visible please contact us.