fiona.png
spreads (20).gif

South Coast Pix presents: Bridge updates


South Coast Pix have posted:

We had a little time after this afternoon's shoot so we stopped by to check on the progress of the bridge. It looks like it's coming along in leaps and bounds. Also we just received a call from 2EC to let us know that we have been nominated as one of the "2020 Best of Best - Tradies Category". So if you like our pix and think we do a good job, watch this space for updates on how to vote for us. Oh and we also celebrated our 7th Wedding Anniversary today" The construction of the bridge superstructure remains the ongoing focus of the team. Over the coming months Survey and design work will continue for a new L-shaped floating pontoon as part of the bridge project, downstream of the current T-wharf, on the CBD side of the river. The $274 million project is planned to be complete in early 2023.


COMMENTS : Due to the risks associated with comments from unidentified contributors that expose The Beagle to possible legal actions under the NSW Defamation Act 2005 No 77 anonymous or Nom de Plume comments will not be available unless the author is known to the editor by way of a verified email address or by association.

Others who provide their REAL NAME (first name AND Surname) and a verifiable email address (it won't be published) are invited to comment below. (yes it is a pain but please comply - it would be a  shame to see your comment deleted)

Those contributors KNOWN to us and verified may continue to use their First Name or Nom de plume for ease. The primary need for all of this is due to traceability should a legal action arise.

If you need anonymity email us via our normal or encrypted email accounts


Please note that if you are looking for a previous comment that is no longer visible please contact us.