fiona.png
spreads (15).gif

Latest Batemans Bay Bridge images from South Coast Pix

Rob and Kate at South Coast Pix were out an about over the new Bay Bridge project last Friday and bring this update:

"By the looks of it - it's been a massive week for the bridge crew. The machine that was drilling the holes for the pylons has been removed from one of the barges. And the barges themselves have moved closer to the Southern side. And today a pier access tower was taken across the road by one of the two 400 tonne cranes which are being used to help build the bridge. "It will be interesting to see what happens over the next fortnight."

Be sure to Like and Follow South Coast Pix to keep up to date with their stunning documentation of the project.






COMMENTS : Due to the risks associated with comments from unidentified contributors that expose The Beagle to possible legal actions under the NSW Defamation Act 2005 No 77 anonymous or Nom de Plume comments will not be available until an alternate system of author verification can be investigated and hopefully installed.

Those who provide their REAL NAME (first name AND Surname) and a verifiable email address (it won't be published) are invited to comment below. (yes it is a pain but please comply - it would be a  shame to see your comment deleted)

Those contributors KNOWN to us and verified may continue to use their First Name for ease. The primary need for all of this is due to traceability should a legal action arise.

If you need anonymity email us via our normal or encrypted email accounts


Please note that if you are looking for a previous comment that is no longer visible please contact us.