Phillips---Banner.png
spreads (6).gif

Improved amenity at Tuross Main Beach

Visitors to Tuross Head’s Main Beach will soon enjoy improved amenity with a new toilet block.

Work has begun at the Clive Court public toilets with the roof of the old facility already removed. Demolition of the structure continues this week.

The new facility will include standard and accessible toilets, with an additional storage area for use by lifeguards. The new design will improve safety, security and amenity in and around the toilet block.

The project is expected to take around 12 weeks to complete and should be ready in time for the Christmas holiday period. Temporary toilets will be made available throughout the construction period.


Image: Graphic model of new Clive Court public toilet block at Tuross Head.

COMMENTS : You can use a pen name or better yet use your real name, you must provide a valid email address (that does not get published) and your comment will be moderated prior to approval (or rejection if that is the determination of the moderator). Refer to our Terms and Conditions if you have any questions) 

Please note that from time to time comments are archived. If you are looking for a previous comment no longer visible please contact us. Last Archived 7th July 2019