The tug Polaris Marine, with 21 metre construction barge “Okishin” arrived in Nelligen last Saturday with construction materials required for the removal of the old Nelligen bridge.
The next stage of this process will see an additional 55 metre barge arrive this Sunday, with it’s size temporarily consuming the popular picturesque Nelligen waterfront.
Comments