top of page
Screenshot 2023-06-13 180949.png
Writer's pictureThe Beagle

Heavy Duty River Traffic At Nelligen

The tug Polaris Marine, with 21 metre construction barge “Okishin” arrived in Nelligen last Saturday with construction materials required for the removal of the old Nelligen bridge.

The next stage of this process will see an additional 55 metre barge arrive this Sunday, with it’s size temporarily consuming the popular picturesque Nelligen waterfront.

Comments


NOTE: Comments were TRIALED - in the end it failed as humans will be humans and it turned into a pile of merde; only contributed to by just a handful who did little to add to the conversation of the issue at hand. Anyone who would like to contribute an opinion are encouraged to send in a Letter to the Editor where it might be considered for publication

buymeacoffee.png
bottom of page