fiona.png
spreads (7).gif

Day work on Wallaga Lake Bridge

Motorists are advised of changed traffic conditions on the Wallaga Lake Bridge on Wallaga Lake Road from Monday 9 December for four days for essential maintenance.

Bridge maintenance work will be carried out on Wallaga Lake Bridge to ensure the safety of road users.

Work will be carried out between 7am and 4.30pm from Monday 9 until Thursday 12 December, weather permitting.

Traffic control, lane closures and a reduced speed limit of 40 km/h will be in place for the safety of workers and motorists during work hours. Traffic delays may be up to ten minutes.

Motorists are advised to drive to the conditions, and follow the directions of signs and traffic control.

Transport for NSW thanks the community for its patience while work is carried out.

For the latest traffic updates call 132 701, visit livetraffic.com or download the Live Traffic NSW App.


COMMENTS : Due to the risks associated with comments from unidentified contributors that expose The Beagle to possible legal actions under the NSW Defamation Act 2005 No 77 anonymous or Nom de Plume comments will not be available until an alternate system of author verification can be investigated and hopefully installed.

Those who provide their REAL NAME (first name AND Surname) and a verifiable email address (it won't be published) are invited to comment below. (yes it is a pain but please comply - it would be a  shame to see your comment deleted)

Those contributors KNOWN to us and verified may continue to use their First Name for ease. The primary need for all of this is due to traceability should a legal action arise.

If you need anonymity email us via our normal or encrypted email accounts


Please note that if you are looking for a previous comment that is no longer visible please contact us.