qd.png

Changed traffic conditions on Sams Creek Bridge on the Princes Highway at Cobargo

Motorists are advised of changed traffic conditions from tomorrow at Sams Creek Bridge on the Princes Highway at Cobargo to carry out site investigations.

This work involves geotechnical investigations to assess the quality and type of soil around the bridge and plan for future maintenance.

Work will be carried out between 8am and 4pm from Tuesday 6 to Friday 9 August, weather permitting.

Changed traffic conditions including stop/slow traffic control and a reduced speed limit of 40 km/h will be in place for the safety of workers and motorists.

Motorists are advised to drive to the conditions, allow five minutes additional travel time and follow the directions of signs and traffic control.

Transport for NSW thanks motorists for their patience during this time.

For the latest traffic updates download the Live Traffic NSW App, visit livetraffic.com or call 132 701

Image: Google Maps

spreads.gif

COMMENTS : You can use a pen name or better yet use your real name, you must provide a valid email address (that does not get published) and your comment will be moderated prior to approval (or rejection if that is the determination of the moderator). Refer to our Terms and Conditions if you have any questions) 

Please note that from time to time comments are archived. If you are looking for a previous comment no longer visible please contact us. Last Archived 7th July 2019