fiona.png
spreads (15).gif

Changed traffic conditions on Batemans Bay Bridge

Motorists are advised of changed traffic conditions on the Batemans Bay Bridge from Sunday 8 November for routine bridge maintenance work.

Single lane closures and stop/slow traffic control will be in place while the work is carried out.

To minimise impact to motorists work will be carried out between 7pm and 5am from Sunday 8 to Thursday 12 November, weather permitting.

During this night work, testing of the bridge lift span will take place and motorists are advised to allow up to 10 minutes additional travel time.

A reduced speed limit of 40 km/h will also be in place on the Princes Highway over the Batemans Bay Bridge and on Clyde Street west during work hours for the safety of workers and motorists.

Motorists are advised to drive to the conditions and follow the directions of signs and traffic control.

Transport for NSW thanks motorists for their patience during this time.

For the latest traffic updates download the Live Traffic NSW App, visit livetraffic.com or call 132 701.

Image: NSW Maritime

COMMENTS : Due to the risks associated with comments from unidentified contributors that expose The Beagle to possible legal actions under the NSW Defamation Act 2005 No 77 anonymous or Nom de Plume comments will not be available until an alternate system of author verification can be investigated and hopefully installed.

Those who provide their REAL NAME (first name AND Surname) and a verifiable email address (it won't be published) are invited to comment below. (yes it is a pain but please comply - it would be a  shame to see your comment deleted)

Those contributors KNOWN to us and verified may continue to use their First Name for ease. The primary need for all of this is due to traceability should a legal action arise.

If you need anonymity email us via our normal or encrypted email accounts


Please note that if you are looking for a previous comment that is no longer visible please contact us.