Bay bridge to be opened for longer on Friday Oct 18th: expect delays
- The Beagle
- Oct 17, 2019
- 1 min read
BATEMANS BAY Princes Hwy between Clyde St and Wharf Rd
CHANGED TRAFFIC CONDITIONS during bridge lift
Date:Fri 18 Oct 2019 - Fri 18 Oct 2019
Scheduled lane closures for this week Fri (11:30am to 12:30pm)
There will be a short term holding of traffic in both directions, in conjunction with the bridge lift, which is 11:45am to 11:55am. Allow up to 15 minutes extra travel time.
Traffic will be controlled by traffic controllers.
Both directions affected
Advice:Check signage
Exercise caution

Image courtesy of South Coast Pix