fiona.png
spreads (6).gif

Changed Traffic Conditions On The Princes Highway At Coila


Motorists are advised of changed traffic conditions on the Coila Creek Bridge on the Princes Highway at Coila from next week for concrete patching work to be carried out.

Single lane closures will be in place from Tuesday 21 May as work is carried out between 6.30am and 5pm on weekdays.

The work is expected to take four days to complete, weather permitting.

This essential routine maintenance work follows the completion of a five month upgrade to the corrosion protection system on the bridge.

Changed traffic conditions, including top/slow traffic control and a reduced speed limit of 40 km/h will be in place for the safety of workers and motorists.

Motorists are advised to drive to the conditions, and follow the directions of signs and traffic control.

Roads and Maritime Services thanks the community for its patience while work is carried out.

For the latest traffic updates call 132 701, visit livetraffic.com or download the Live Traffic NSW App.


#Community #latest #Weekly #Tuross

COMMENTS : Due to the risks associated with comments from unidentified contributors that expose The Beagle to possible legal actions under the NSW Defamation Act 2005 No 77 anonymous or Nom de Plume comments will not be available until an alternate system of author verification can be investigated and hopefully installed.

Those who provide their REAL NAME (first name AND Surname) and a verifiable email address (it won't be published) are invited to comment below. (yes it is a pain but please comply - it would be a  shame to see your comment deleted)

Those contributors KNOWN to us and verified may continue to use their First Name for ease. The primary need for all of this is due to traceability should a legal action arise.

If you need anonymity email us via our normal or encrypted email accounts


Please note that if you are looking for a previous comment that is no longer visible please contact us.