Motorists are advised of changed traffic conditions on the Princes Highway this week for maintenance work at Bodalla and Coila.
Repair work to the road shoulder will be carried out at each location.
Work in Bodalla will be carried out one kilometre north of Tuross River Bridge between 7am and 4pm on Tuesday 19 March and Wednesday 20 March.
Work in Coila will be carried out at the intersection of the Princes Highway and Hector McWilliam Drive between 7am and 5pm on Wednesday 20 March, weather permitting.
Stop/slow traffic control and a reduced speed limit of 40 km/h will be in place for the safety of workers and motorists.
Motorists are advised to drive to the conditions, follow the directions of signs and traffic control and allow up to 10 minutes additional travel time.
Roads and Maritime Services thanks the community for its patience while work is carried out.
For the latest traffic updates call 132 701, visit livetraffic.com or download the Live Traffic NSW App.