fiona xmas.png
spreads (7).gif

Burrill Lake Bridge opens today


The new Burrill Lake Bridge on the Princes Hwy, just south of Ulladulla, will reopen to traffic in both directions today, Friday 29 September, well ahead of its scheduled opening in early 2018. Traffic in both directions will switch over to the new bridge. Motorists are advised to exercise caution when travelling under the new traffic conditions and to expect minor delays. A reduced speed limit of 40km/h will be in place during the changeover. Ongoing roadworks will continue to take place at intersections either side of the bridge as well as the complete removal and demolition of the old bridge.


#latest #Weekly #Community

COMMENTS : Due to the risks associated with comments from unidentified contributors that expose The Beagle to possible legal actions under the NSW Defamation Act 2005 No 77 anonymous or Nom de Plume comments will not be available until an alternate system of author verification can be investigated and hopefully installed.

Those who provide their REAL NAME (first name AND Surname) and a verifiable email address (it won't be published) are invited to comment below. (yes it is a pain but please comply - it would be a  shame to see your comment deleted)

Those contributors KNOWN to us and verified may continue to use their First Name for ease. The primary need for all of this is due to traceability should a legal action arise.

If you need anonymity email us via our normal or encrypted email accounts


Please note that if you are looking for a previous comment that is no longer visible please contact us.