fiona xmas.png
spreads (8).gif

Narooma Bridge Works - Dec 12th to 15th


CHANGED TRAFFIC CONDITIONS FOR ROUTINE MAINTENANCE ON NAROOMA BRIDGE

Motorists are advised of changed traffic conditions on the Princes Highway at Narooma Bridge from next week for routine maintenance work to be carried out.

Work includes the biannual inspection and service of the lift span operation, to ensure the bridge’s continued reliable operation to allow it to open efficiently for large marine traffic, and reduce delays for motorists.

Work is also designed to reduce long term maintenance costs.

To reduce the impact to motorists, work has been scheduled between 7pm and 5am from Monday 12 to Thursday 15 December, weather permitting.

For the safety of workers and motorists, lane closures, traffic control and a reduced speed limit of 40 km/h will be in place during work hours.

Roads and Maritime Services thanks motorists for their patience while work is carried out.

For the latest traffic updates call 132 701, visit livetraffic.com or download the Live Traffic NSW App. Media Release


#latest #Narooma #Dalmeny

COMMENTS : Due to the risks associated with comments from unidentified contributors that expose The Beagle to possible legal actions under the NSW Defamation Act 2005 No 77 anonymous or Nom de Plume comments will not be available until an alternate system of author verification can be investigated and hopefully installed.

Those who provide their REAL NAME (first name AND Surname) and a verifiable email address (it won't be published) are invited to comment below. (yes it is a pain but please comply - it would be a  shame to see your comment deleted)

Those contributors KNOWN to us and verified may continue to use their First Name for ease. The primary need for all of this is due to traceability should a legal action arise.

If you need anonymity email us via our normal or encrypted email accounts


Please note that if you are looking for a previous comment that is no longer visible please contact us.