The Beagle

Feb 24, 2021

Temporary closure on the Kings Highway at Currowan

Motorists are advised of the temporary closure of the Kings Highway at Currowan next week for roadside rock blasting to improve safety.

Work will take place 650 metres west of Western Distributor Road for about 20 minutes between 12pm and 2pm on Wednesday 3 March, weather permitting.

Reduced speed limits and stop/slow traffic control will be in place for the safety of workers and road users.

Motorists are advised to allow 20 minutes additional travel time, drive to the conditions, and follow the directions of signs and traffic control.

Transport for NSW thanks road users for their patience during this time.

For the latest traffic updates download the Live Traffic NSW App, visit livetraffic.com or call 132 701.
 

 

0