The Beagle

Oct 8, 2021

Changed traffic conditions on Princes and Kings Highways in Batemans Bay

Motorists are advised of changed traffic conditions until mid-November on the Princes Highway and Kings Highway in Batemans Bay.

Work on roundabout and median upgrades, asphalt resurfacing, line marking and landscaping will be carried out in various locations on the Princes Highway and Kings Highway, as part of the Batemans Bay Bridge replacement project.

Changed traffic changes including temporary lane closures and a reduced speed limit of 40 km/h will be in place in both directions within the work zone for the safety of workers and motorists.

Work will be carried out until mid-November on weekdays between 7am and 6pm and Saturdays between 8am and 1pm.

For the safety of motorists some traffic changes will remain outside of work hours.

Motorists are advised to drive to the conditions and follow the directions of signs and traffic control.

Pedestrians may also experience changes such as temporary surface changes, and detours, when crossing the road in this area and should follow directions of signs and traffic control at all times.

Transport for NSW thanks motorists and pedestrians for their patience during this work.

For more information on the Batemans Bay Bridge replacement project, go to nswroads.work/BatemansBayBridge.

For the latest traffic updates download the Live Traffic NSW App, visit livetraffic.com or call 132 701.
 

 

0