The Beagle

Sep 21, 2020

Changed traffic conditions at Narooma Bridge on Princes Highway

Motorists are advised of changed traffic conditions this week along the Princes Highway for work on the Narooma bridge over Wagona Inlet.

For the safety of workers and motorists, one lane of the bridge will be shut on Wednesday 23 September between 6pm and 12 am.

Traffic control and a reduced speed limit of 40 km/h will be in place for the safety of workers and road users during this time

Motorists are advised to drive to the conditions and follow the directions of signs and traffic control.

As part of routine inspections on the bridge, workers will be inspecting the road surface and the supporting structure from Tuesday 22 to Friday 25 September between 7am and 5pm.

Transport for NSW thanks road users for their patience during this time.

For the latest traffic updates download the Live Traffic NSW App, visit livetraffic.com or call 132 701.

0