The Beagle

Dec 18, 2020

Additional lift openings for Batemans Bay Bridge Friday 18 and Saturday 19 Dec

Road users are advised of additional lift openings of the Batemans Bay Bridge on Friday and Saturday nights over the next two weekends.

The additional lift openings will take place this week at 6.20pm and 8.50pm on Friday 18 and Saturday 19 December.

Lift openings may take up to 10 minutes and delays may be experienced on the Princes Highway, Kings Highway and local roads.

Motorists and pedestrians are advised to plan their journeys, allow additional travel time and follow the bridge signals.

Transport for NSW thanks road and river users for their patience during this time.
 

 

0